Reinstate the work area following Tramway engineering and maintenance activities

URN: UKTTWE09
Business Sectors (Suites): Tramway Engineering
Developed by: UK Tram
Approved on: 30 Mar 2021

Overview

​This standard is about reinstating the work area following Tramway engineering and maintenance activities.  You will be able to confirm that the work area is left in a safe condition and meets your organisations procedures.  This will include confirming that any waste materials are disposed of and any materials and equipment that cannot be removed is safely secured for later collection.

Safety is a key theme throughout this standard.  You will be able to confirm that any safe working measures are withdrawn, and the work area is reinstated at the appropriate time and in the correct sequence to ensure the safety of yourself, those in your team and the wider Tramway environment.

You will know and understand the importance of communicating the intention to reinstate the work area to the relevant **stakeholders.  You will also understand how to safely secure and store equipment and the procedures for dealing with reusable and waste items.

This standard is for those who work in the Tram engineering environment at supervisor/technician level.


Performance criteria

You must be able to:

P1        confirm you are wearing the correct PPE (Personal Protective Equipment) and following the relevant health and safety procedures

P2        obtain and interpret the relevant information and documentation relating to the work area and the completion of Tramway engineering and maintenance activities

P3        confirm the work area is in a safe condition following the completion of Tramway engineering and maintenance activities

P4        confirm that materials, equipment and components that cannot be removed immediately are secure and stored in line with your organisational procedures

P5        dispose of waste materials and hazardous substances in line with organisational procedures and the relevant legislation

P6        communicate the intention to reinstate the work area to the relevant stakeholders

P7        supervise the withdrawal of safe working measures in line with organisational procedures

P8        confirm the work area has been reinstated in line with organisational procedures

P9        manage problems within your control and report those that cannot be resolved


Knowledge and Understanding

You need to know and understand:


K1        the relevant health and safety procedures appropriate to the activity including safe systems of work K2        the different types of information and documentations used when reinstating the work area K3        the types of materials, equipment and components that can be stored on site K4        the organisational methods and procedures of disposing of waste materials and hazardous substances K5        the importance of withdrawing safe working measures in the correct sequence and in the required timescales K6        how to confirm safe working measures outside your own control have been withdrawn K7        the importance of considering stakeholder requirements when reinstating the work area following Tramway engineering and maintenance activities K8        your organisation's methods and procedures for confirming the work area has been reinstated K9        the relevant organisational reporting lines and procedures relating to the reinstatement of the work area K10    the limits of your own authority and those of other stakeholders involved

Scope/range


Scope Performance

P1        Health and safety procedures **may include; ergonomic working, moving and manual handling, Personal Protective Equipment (PPE), working time and breaks, lone working, Personal Track Safety, safe systems of work (authorised access/egress points, signage, lighting, CCTV, walking to and from a work site, planned protection arrangements, emergency stop protection arrangements, possession arrangements, isolation requirements, communication/warning arrangements and techniques, positions of safety, safety zones, lookout arrangements, first aid points, emergency assembly point, safety briefings,  fire evacuation, working at height requirements, working in confined spaces requirements, authorised walking routes, emergency service support (as required), walking to and from a vehicle, designated parking areas).

P2        Information and documentation may include; risk assessments, methods statements, specifications, drawings, current regulations, organisational procedures relating to the reinstatement of the work area, permits/licences.

P4        Materials, equipment and components **may include; waste materials, recycling, plant and machinery, temporary traffic management equipment, consumables, vehicles. 

P6        Stakeholders may include; **colleagues, contractors, pedestrians, road users, businesses, landowners, councils, general public, emergency services, transport operators, passengers, customers.

P7        Safe working may include; temporary traffic management system, isolation, possession, protection, signs, barriers, walkways.


Scope Knowledge


Values


Behaviours


Skills


Glossary


Tramway

Includes the tramway (a set of rails, switches and crossings which form the route of a Tram) , infrastructure (fixed assets used for the running of the Tram transport system, including, the tramway, bridges, tunnels, stops, stations and fixed equipment for signalling, communications and electrification), depots, stabling yards.

* *


Links To Other NOS


External Links


Version Number

1

Indicative Review Date

31 Mar 2024

Validity

Current

Status

Original

Originating Organisation

n/a

Original URN

None

Relevant Occupations

Engineering, Engineering Technicians

SOC Code

3113

Keywords

Tram, Tramway, reinstate, engineering, maintenance.