This standard is about handing over responsibility of Tram vehicle assets prior to and following work activities and before the Tram vehicle returns to operational service. It includes identifying the personnel involved in the handover process and confirming and agreeing the condition of the asset prior to undertaking work activities and also following the completion of work activities. You will be able to confirm that the allocated tasks, the required integrity tests and checks and all the necessary documentation have been completed in line with organisational procedures.  This may include the consideration of manufacturer and supplier warranties and contract arrangements.  Upon the handover of a Tram vehicle asset you will be expected to highlight any new, current or changed operating features and equipment.  You will also be able to ensure you receive confirmation that those involved in the handover process accept that the Tram vehicle is in a satisfactory condition.

This standard is for those who work in the Tram engineering environment at supervisor/technician level.


Performance criteria

You must be able to:

P1        confirm you are wearing the correct PPE (Personal Protective Equipment) and following the relevant health and safety procedures

P2        confirm that the integrity test and checks have been undertaken in line with organisational procedures

P3        confirm the Tram vehicle asset is in an operational condition for the handover to take place in line with organisational procedures

P4        identify the personnel involved in the handover process

P5        confirm that the personnel involved in the handover accept the condition and status of the Tram vehicle asset

P6        undertake handover in line with organisational procedures

P7        deal with any issues relating to the handover in line with organisational procedures

P8        complete a record of the handover in line with organisational procedures


Knowledge and Understanding

You need to know and understand:

K1        the relevant health and safety procedures appropriate to the activity including safe systems of work K2        what an operational condition of a Tram vehicle asset means and how this is confirmed K3        the personnel involved during the handover of a Tram vehicle asset K4        the importance of highlighting, where required, any new, current or changed operating features of the tram vehicle asset K5        how to confirm that the personnel you are handing over the Tram vehicle asset to accepts that it is in an operational condition K6        the types of problems that can occur during the handover process and how these can be overcome K7        the importance of the handover process in the Tram and Tramway environment K8        the **documents** that are required to be in place prior to the handover of a Tram vehicle asset K9        the importance of considering manufacturer, supplier warranty and contract arrangements when gathering documents and completing records  K10      the organisational procedures for recording the handover of responsibility of Tram vehicle assets

Scope/range


Scope Performance

P1        **Health and safety** **procedures** ****may include; ergonomic working, moving and manual handling, Personal Protective Equipment (PPE), working time and breaks, lone working, Personal Track Safety, safe systems of work (authorised access/egress points, signage, lighting, CCTV, walking to and from a work site, planned protection arrangements, emergency stop protection arrangements, possession arrangements, isolation requirements, communication/warning arrangements and techniques, positions of safety, safety zones, lookout arrangements, first aid points, emergency assembly point, safety briefings,  fire evacuation, working at height requirements, working in confined spaces requirements, authorised walking routes, emergency service support (as required), walking to and from a vehicle, designated parking areas). P4        **Personnel** may include; Tram driver, team leader, supervisor, manager, other department (e.g. cleaning), other specified person.

Scope Knowledge

K9        Documents may include; job card, maintenance log or report, accident report, servicing, breakdown report, modification drawings, diagrams, certificates, company specific information.


Values


Behaviours


Skills


Glossary

Tram

Tramcars, tram vehicle, and any other rail vehicles that operate on tramways. It includes one or more trams coupled together and includes non-passenger-carrying vehicles.

* *


Links To Other NOS


External Links


Version Number

1

Indicative Review Date

31 Mar 2024

Validity

Current

Status

Original

Originating Organisation

n/a

Original URN

None

Relevant Occupations

Engineering and Manufacturing Technologies, Transportation Operations and Maintenance

SOC Code

3113

Keywords

Tram, Tramway, handover, responsibility, condition.