Supervise the obtaining and preparing of materials and components needed for the renewal or maintenance of the permanent way

URN: SEMPW409
Business Sectors (Suites): Rail Engineering
Developed by: NSAR
Approved on: 2024

Overview

This standard is about supervising the obtaining and preparing of materials and components needed for the renewal or maintenance of the permanent way to ensure that correct and adequate materials and components are available.

You will be required to supervise the obtaining and preparing of materials and components. You will know the types of components and materials needed and the materials preparations required for the renewal or maintenance of the permanent way.

During this work, you must take account of the relevant worksite operational requirements, procedures and safe working practices as they apply to you.

You will be expected to work within approved procedures and specifications and will work within the limits of your own responsibility.

Your underpinning knowledge will provide a good understanding of your work and will provide an informed approach to applying problem-solving techniques and procedures during this supervision.

You will comply with any organisational procedures, and legislative or regulatory health, safety and environmental requirements applicable during this supervision.

This standard is for all supervisors carrying out permanent way engineering activities.


Performance criteria

You must be able to:

P1 maintain safe working practices and comply with all relevant health and safety regulations, directives, and guidelines
P2 ensure the required materials and components are obtained and check them for quantity and quality
P3 establish how the materials and components need to be prepared
P4 supervise that preparations are carried out using suitable equipment
P5 supervise the preparation of materials and components
P6 prepare appropriate documentation to update on progress and report completion of activities in line with your organisation's procedures
P7 address problems within your control and report unresolved issues


Knowledge and Understanding

You need to know and understand:

K1 the relevant health and safety regulations, directives, guidelines, and safe working practices and procedures defined by your organisation, as appropriate to the activity and your working area
K2 your responsibilities in respect of health, safety and environment, including the limits of your personal responsibility, your legal responsibility for your own health and safety and the health and safety of others
K3 the importance of wearing protective clothing and other appropriate type of safety equipment (PPE) and where to obtain it from
K4 the hazards associated with working on permanent way infrastructure
K5 the methods and requirements for work area preparation, including:
K5.1 access requirements
K5.2 storage requirements
K5.3 levelling requirements[SN1]
K5.4 securing materials
K6 the types of materials and components that may be required for the renewal or maintenance of the permanent way, including:
K6.1 ballast
K6.2 sleepers/bearers
K6.3 chairs and base plates
K6.4 insulations
K6.5 fastenings
K6.6 rails
K6.7 S&C components
K6.8 drainage materials and components
K6.9 consumables
K6.10 gas bottles (non-welding)
K7 the type and complexity of material preparations, including:
K7.1 handling, stacking and storage
K7.2 pre-treatment
K7.3 access and surface constraints (including in tunnels, on slopes, bridges, S&C) - some of the S&C components may be vulnerable to damage by incorrect handling and/or storage
K8 how to source and interpret information relating to the correct storage of materials and components
K9 how to check the quality and quantity of materials and components
K10 the types of defects that may occur on materials and components that can be identified by visual means
K11 the methods and techniques for material/component handling and preparation, including:
K11.1 timescales for preparation
K11.2 manual handling techniques
K11.3 mechanical handling
K11.4 lifting regulations
K11.5 lifting plans
K12 the types of problems that can occur when obtaining materials and components and how these can be overcome
K13 your organisation's procedures and methods for monitoring the preparation of materials and components
K14 your organisation's procedures for the care and control of tools and equipment
K15 the relevant data management processes and technologies for recording information
K16 the relevant reporting lines, timeframes and procedures as approved by your organisation
K17 the impact of your work on the operations of other departments and the impact of their work for you
K18 the allocation of tasks and duties
K19 the benefits of team working and methods to achieve this
K20 the limits of your own authority and responsibility and those of others involved
K21 deal with problems within your control and report those that cannot be resolved


Scope/range


Scope Performance


Scope Knowledge


Values


Behaviours


Skills


Glossary


Links To Other NOS


External Links


Version Number

4

Indicative Review Date

2027

Validity

Current

Status

Original

Originating Organisation

SEMTA

Original URN

SEMPW409

Relevant Occupations

Rail Engineering

SOC Code


Keywords

Supervise; prepare; material; component