Complete testing, gauging and acceptance of overhead line equipment LEGACY

URN: SEMOLEC307L
Business Sectors (Suites): Rail Engineering Overhead Line Equipment Construction Suite 3
Developed by: Enginuity
Approved on: 2017

Overview


Performance criteria

You must be able to:


Knowledge and Understanding

You need to know and understand:


Scope/range


Scope Performance


Scope Knowledge


Values


Behaviours


Skills


Glossary


Links To Other NOS


External Links


Version Number


Indicative Review Date

2017

Validity

Legacy

Status

Original

Originating Organisation


Original URN


Relevant Occupations

Rail Engineering

SOC Code

8153

Keywords

Rail engineering; testing; gauging; acceptance; overhead line equipment construction; OLE; OLEC