Overhauling pump assemblies

URN: SEMMME3114
Business Sectors (Suites): Mechanical Manufacturing Engineering Suite 3
Developed by: Enginuity
Approved on: 30 Mar 2023

Overview

| --- |
|

This standard identifies the competences you need to carry out a complete overhaul of pump assemblies, in accordance with approved procedures. The pump assembly to be overhauled will have been removed from its operating environment, and the overhauling activities will take place in a maintenance environment or manufacturer's workshop.

In carrying out the overhauling operations, you will be required to follow laid-down procedures and to use specific dismantling and rebuilding techniques. The overhauling activities will involve removing all ancillary components and sub-assemblies, separating the pump housing and removing the pump operating mechanism, bearings and seals, valves, wear rings, stuffing box and gland packing, and stripping the pump housing of all its components. You will be required to inspect the components for damage and wear, and to make decisions on which components can be re-used and which will need replacing.

You will then rebuild the pump assembly, which will involve fitting replacement or overhauled sub-assembly units, such as pump shaft, diaphragms, impeller, pistons, vanes, gears, wear rings, bearings and seals, and the replacement of all damaged, worn and `lifed' components. The overhauling activities will include making all necessary checks and adjustments to ensure that components are correctly replaced, positioned, aligned, adjusted, torque loaded, locked and fastened, and that the correct sealants are used.

Your responsibilities will require you to comply with organisational policy and procedures for the overhaul of the pump assembly, and to report any problems with the overhauling activities, or with the tools and equipment used that you cannot personally resolve, or that are outside your permitted authority, to the relevant people. You must ensure that all tools, equipment and materials used in the overhauling activities are removed from the work area on completion of the activities, and that all necessary job/task documentation is completed accurately and legibly. You will be expected to work with a minimum of supervision, taking personal responsibility for your actions and for the quality and accuracy of the work that you carry out.

Your underpinning knowledge will provide a good understanding of your work, and will provide an informed approach to applying appropriate overhauling techniques and procedures to pump assemblies. You will understand the dismantling and reassembly methods and procedures used, and their application. You will know how the pump assembly functions, the purpose of the individual components and associated defects, in adequate depth to provide a sound basis for carrying out the overhauling activities to the required specification. In addition, you will have sufficient knowledge of these components to ensure that they are fit for purpose and meet the specifications, thus providing a sound basis for carrying out the reassembly.

You will understand the safety precautions required when carrying out the overhauling activities associated with pump assemblies, especially those for lifting, handling and supporting the equipment being removed and replaced. You will be required to demonstrate safe working practices throughout, and will understand your responsibility for taking the necessary safeguards to protect yourself and others in the workplace.


Performance criteria

You must be able to:

| --- |
|

  1. work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines
  2. follow the relevant overhauling schedules to carry out the required work
  3. establish the components to be removed and, where appropriate, mark components to aid re-assembly
  4. ensure that any stored energy or substances are released safely and correctly
  5. carry out the overhaul to the agreed level, using the correct tools and techniques
  6. ensure that all removed components are correctly identified and stored in the correct location
  7. report any instances where the overhauling activities cannot be fully met, or where there are identified defects outside the planned overhauling schedule
  8. complete the relevant documentation, in accordance with organisational requirements
  9. dispose of unwanted components, waste materials and substances, in accordance with safe working practices and approved procedures
  10. deal promptly and effectively with problems within your control and report those that cannot be solved

Knowledge and Understanding

You need to know and understand:

| --- |
|

  1. how to work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines
  2. the hazards associated with overhauling pump assemblies and how to minimise them and reduce any risks
  3. the importance of wearing protective clothing (PPE) and other appropriate safety equipment during the overhaul
  4. how to obtain and interpret drawings, specifications, manufacturers' manuals, history/maintenance reports, and other documents needed in the overhauling process
  5. how to carry out currency/issue checks on the specifications you are working with
  6. the quality control procedures to be followed during the overhauling operations
  7. the procedure for obtaining replacement parts, materials and other consumables necessary for the overhaul
  8. company policy on the repair/replacement of components during the overhauling process
  9. terminology used in pump assemblies
  10. the basic principles of how the pump assembly functions, its operating sequence, the working purpose of individual units/components and how they interact
  11. the extent to which the equipment is to be dismantled for overhaul
  12. the sequence to be adopted for the dismantling/reassembling of the pump assembly
  13. the techniques used to dismantle the pump assembly, without damage to the components or surrounding structure
  14. the need to protect the system integrity by ensuring that exposed components are correctly covered/protected
  15. how to lift and move large components and assemblies; the methods and equipment used to transport, handle and lift the components during the overhauling activities
  16. the need to ensure that lifting and handling equipment is within its current certification dates
  17. methods of checking that components are fit for purpose, how to identify defects and wear characteristics, and the need to replace `lifed' and consumable items
  18. the uses of measuring equipment
  19. methods of reassembling the pump, using new or previously overhauled components
  20. how to make adjustments to replaced components/assemblies to ensure that they function correctly
  21. the various mechanical fasteners that are used, and their method of removal and replacement
  22. the various types of electrical connectors that are used, methods of unlocking, orientation indicators, and locating and locking in of the connections
  23. the tools and equipment used in the overhauling activities, and how to check that they are in a safe/usable condition
  24. the importance of ensuring that all tools are used correctly and within their permitted operating range
  25. the importance of ensuring that all tools, equipment and components are accounted for and returned to their correct location on completion of the overhauling activities
  26. the procedure for the safe disposal of waste materials
  27. the need to complete the overhaul documentation and/or reports following the overhauling activity
  28. the problems that can occur during the overhauling activity, and how they can be overcome
  29. the extent of your own authority and to whom you should report if you have a problem that you cannot resolve

Scope/range


Scope Performance

| --- |
|

  1. Carry out all of the following during the overhaul of the pump assembly:
    1. obtain and use the appropriate documentation for the overhauling activities
    2. adhere to procedures or systems in place for risk assessment, personal protective equipment and other relevant safety regulations and procedures to realise a safe system of work
    3. provide and maintain safe access and working arrangements for the work area
    4. ensure that the pump assembly is suitably supported, and that appropriate lifting and handling equipment is available
    5. carry out the overhauling activities, following good practice/approved procedures
    6. ensure that components and surrounding structures are maintained free from damage and foreign objects
    7. return all tools and equipment to the correct location on completion of the activities
    8. leave the work area in a clean and safe condition on completion of the activities
  2. Overhaul both of the following types of pump:
    1. kinetic/centrifugal
    2. positive displacement
  3. Overhaul pump assemblies operating on two of the following methods:
    1. piston/plunger
    2. flexible impeller
    3. lobe type
    4. progressive cavity/screw type
    5. diaphragm
    6. rotary vane
    7. flexible liner
    8. bellows
    9. internal gear
    10. hydrostatic
    11. other specific type
  4. Carry out all of the following activities on the pump equipment being overhauled:
    1. cleaning/decontaminating parts prior to dismantling
    2. replacing all damaged or defective sub- assemblies and components
    3. pre-disassembly checks and tests
    4. releasing stored energy (where applicable)
    5. replacing all `lifed' items (such as seals, bearings, gaskets)
    6. draining/removing any remaining fluids
    7. proof-marking/labelling of components to aid reassembly
    8. dismantling equipment to unit/sub-assembly level
    9. dismantling units to component level
    10. checking components for wear and serviceability (such as visual, measurement, use of probes/scopes)
    11. balancing components (where applicable)
    12. removing and replacing components having interference fits (such as by expansion, contraction, pressure)
    13. `blue bedding' components (where applicable)
    14. reassembling the pump unit
    15. making mechanical connections
    16. setting and adjusting replaced components
    17. applying gaskets and sealant/adhesives
    18. applying correct lubrication during assembly
    19. securing components using mechanical fasteners and threaded devices (such as nuts, bolts, circlips, pins)
    20. tightening fastenings to the required torque
    21. applying locking and retaining devices (such as circlips, pins, wire locking, lock nuts, stiff nuts, swage nuts)
    22. applying protection to openings to prevent entry of contaminating debris
  5. Replace/refit a range of pump assembly components, to include ten of the following:
    1. pump housings
    2. connecting rods
    3. bearings
    4. locks and stops
    5. shafts
    6. wear rings
    7. diaphragms
    8. shims and packing
    9. impellers
    10. vanes
    11. levers and linkages
    12. bellows
    13. operating mechanisms
    14. pistons
    15. locking devices
    16. valves
    17. wire thread inserts
    18. gear assemblies
    19. pipes and unions
    20. static seals/gaskets
    21. mechanical controls (such as plungers, springs, rollers)
    22. dynamic seals (lipped or mechanical)
    23. electrical controls (such as solenoids, motors, switches)
    24. gland packing
    25. other specific components
  6. Carry out checks and tests on the overhauled pump assembly, to include all of the following:
    1. visual inspection for completeness of all operations
    2. visual inspection for freedom from damage or foreign objects
    3. applying protection to openings to prevent entry of contaminating debris
    4. carrying out any `special-to-type' checks (such as bearing end float, impeller clearance, pump gear timing)
  7. Overhaul pump assemblies, in compliance with one of the following:
    1. BS, ISO or BSEN standards and procedures
    2. customer standards and requirements
    3. company standards and procedures
    4. pump manufacturer's requirements

Scope Knowledge


Values


Behaviours


Skills


Glossary


Links To Other NOS


External Links


Version Number

3

Indicative Review Date

31 Mar 2028

Validity

Current

Status

Original

Originating Organisation

Enginuity

Original URN

SEMMME3114

Relevant Occupations

Engineering, Engineering and Manufacturing Technologies, Engineering Technicians

SOC Code

3113

Keywords

Mechanical engineering; overhaul; pump; assemblies; kinetic; centrifugal; positive displacement; piston; plunger; diaphragm; bellows; impeller; rotary vane; internal gear; lobe; liner; hydrostatic; progressive cavity; screw