Installing marine power generation and distribution equipment and systems

URN: SEMME3005
Business Sectors (Suites): Marine Engineering Suite 3
Developed by: Enginuity
Approved on: 28 Feb 2019

Overview

This standard identifies the competences you need to install marine power generation and distribution systems, in accordance with approved procedures. You will be required to use appropriate installation drawings, specifications and documentation to install the various items of equipment. You will be expected to position, align and secure equipment in its correct locations, using the specified/appropriate techniques and termination devices. The equipment will include batteries, generators, alternators, regulators, invertors, transformers, rectifier units, automatic voltage regulators and main contactors/circuit breakers.

Your responsibilities will require you to comply with organisational policy and procedures for the installation activities undertaken and to report any problems with the installation that you cannot personally resolve, or are outside your permitted authority, to the relevant people. You will be expected to work with minimal supervision, taking personal responsibility for your own actions and for the quality, accuracy and safety of the work that you carry out.

Your underpinning knowledge will provide a good understanding of your work and will provide an informed approach to applying installation techniques and procedures to marine power generation and distribution. You will understand the power supplies being installed and their application and will know about the installation tools, techniques and methods, in adequate depth to provide a sound basis for carrying out the activities to the required specification.

You will understand the safety precautions required when carrying out the installation operations. You will be required to demonstrate safe working practices throughout and will understand the responsibility you owe to yourself and others in the workplace.


Performance criteria

You must be able to:

  1. work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines

  2. follow all relevant drawings and specifications for the installation being carried out

  3. use the correct tools and equipment for the installation operations and check that they are in a safe and usable condition
  4. install, position and secure the equipment and components in accordance with the specification, using appropriate methods and techniques

  5. ensure that all necessary connections to the equipment are complete

  6. deal promptly and effectively with problems within your control and report those that cannot be solved
  7. check that the installation is complete and that all components are free from damage
  8. complete relevant documentation in line with organisational procedures

Knowledge and Understanding

You need to know and understand:

  1. the specific safety practices and procedures that you need to observe when working with marine electrical power generation and distribution systems (including any specific legislation, regulations/codes of practice for the activities, equipment or materials)
  2. the health and safety requirements of the work area where you are carrying out the activities and the responsibility these requirements place on you
  3. the hazards associated with installing marine power generation and distribution systems and with the tools and equipment used and how they can be minimised
  4. how to recognise and deal with emergencies and the procedures to be followed (such as methods of safely evacuating and closing down of compartments in the case of fire or other major incident, first aid, fire fighting and resuscitation of personnel)
  5. the protective equipment that you need to use for both personal protection (PPE) and protection of the vessel
  6. the precautions to be taken to prevent electrostatic discharge (ESD) damage to circuits and sensitive components (such as use of earthed wrist straps)
  7. what constitutes a hazardous voltage and how to recognise victims of electric shock
  8. how to reduce the risks of a phase to earth shock (such as insulated tools, rubber matting and isolating transformers)

  9. the interpretation of drawings, standards, quality control procedures and specifications used for the installation (including BS and ISO schematics, symbols and terminology)

  10. how to carry out currency/issue checks of the specifications you are working with
  11. the components to be installed and their function within the particular power distribution system
  12. the various mechanical fasteners that will be used and their method of installation (including threaded fasteners, special securing and locking devices)
  13. the importance of using the specified fasteners for the particular installation and why you must not substitute others
  14. why securing devices need to be locked and identified and the different methods that are used
  15. the quality control procedures to be followed during the installation operations
  16. the procedures for ensuring that you have the correct type of tools, equipment, electrical components and fasteners for the activities
  17. the techniques used to position, align, adjust and secure the components to the system, without damage
  18. methods of lifting, handling and supporting the components/equipment during the installation activities
  19. the use of seals, sealants, adhesives and anti-electrolysis barriers and the precautions that need to be taken
  20. why unit electrical bonding and continuity is critical and why it must be both mechanically and electrically secure
  21. the procedure for the safe disposal of waste materials
  22. how to conduct any necessary checks to ensure the system integrity, functionality, accuracy and quality of the installation
  23. how to recognise installation defects (such as misalignment, ineffective fasteners or terminations, damage or contamination)
  24. the importance of ensuring that the completed installation is to the category of cleanliness prescribed and of ensuring that any exposed components or pipe ends are correctly covered/protected and warning notices are fitted
  25. the tools and equipment used in the installation activities and their calibration/care and control procedures
  26. why tool/equipment control is critical and what to do if a tool or piece of equipment is unaccounted for on completion of the activities
  27. the problems that can occur with the installation operations and how these can be overcome
  28. the recording documentation to be completed for the activities undertaken and where appropriate, the importance of marking and identifying specific pieces of work in relation to the documentation
  29. the extent of your own responsibility and whom you should report to if you have problems that you cannot resolve

Scope/range


Scope Performance

  1. Carry out all of the following during the installation of the power generation and distribution equipment:

    1. use the correct issue of vessel/craft/structure installation drawings and technical documentation
    2. use copies of relevant COSHH sheets, risk assessment and marine engineering standards
    3. check the calibration dates of tools to be used
    4. obtain clearance to work on the system and observe the power isolation and safety procedures
    5. return all tools and equipment to the correct location on completion of the installation activities
    6. leave the work area in a safe condition and to the prescribed category of cleanliness
  2. Install marine electrical power generation and distribution equipment, which includes four of the following:

    1. batteries                      
    2. regulators                  
    3. rectifier units
    4. generators                  
    5. inverters                           
    6. main contactors/breakers
    7. alternators                         
    8. transformers                    
    9. change-over relays
    10. starters and control gear    
    11. automatic voltage regulators (AVRs)
    12. static frequency changers
    13. junction boxes
    14. fuse panels
  3. Use all of the following installation methods and techniques:

    1. levelling and aligning           
    2. continuity checks                
    3. securing and locking
    4. earth bonding                      
    5. taking electrostatic discharge (ESD) precautions
  4. Use three of the following types of mechanical securing connections:

    1. threaded fasteners   
    2. screws                                       
    3. quick release fasteners
    4. locking devices                    
    5. torque loaded bolts
    6. other specific connection
  5. Make three of the following types of electrical connection:

    1. module blocks                     
    2. free plugs                                    
    3. soldering/brazing
    4. terminal blocks                      
    5. earth bonding points
    6. tray-mounted sockets            
    7. crimping
    8. other specific connection
  6. Produce installations which comply with one of the following standards:

    1. BS or ISO standards and procedures                             
    2. company standards and procedures
    3. specific system requirements
    4. customer (contractual) standards and requirements    
    5. IET Regulations (current issue)
    6. recognised compliance agency/body's standards
    7. other accepted international standards
  7. Complete the relevant documentation, to include one from the following, and pass it to the appropriate people:

    1. installation records               
    2. system log         
    3. job cards           
    4. work authorisation documents
    5. acceptance documentation     
    6. other specific recording method

Scope Knowledge


Values


Behaviours

Behaviours:

You will be able to apply the appropriate behaviours required in the workplace to meet the job profile and overall company objectives, such as:

  • strong work ethic
  • positive attitude
  • team player
  • dependability
  • responsibility
  • honesty
  • integrity
  • motivation
  • commitment

Skills


Glossary


Links To Other NOS


External Links


Version Number

3

Indicative Review Date

28 Feb 2021

Validity

Current

Status

Original

Originating Organisation

Semta

Original URN

SEMME3005

Relevant Occupations

Marine Engineering Trades

SOC Code

5235

Keywords

Engineering; marine; install; power; generation; distribution; generators; alternators; regulators; batteries; equipment; systems