Overhauling components of aircraft communication equipment

URN: SEMAE3175
Business Sectors (Suites): Aeronautical Engineering Suite 3
Developed by: Enginuity
Approved on: 2021

Overview

This standard identifies the competences you need to carry out overhauling activities on components of aircraft communication equipment, in accordance with approved procedures. The equipment to be overhauled will have been removed from the aircraft and the overhauling activities may take place in a workshop or hangar.

It covers equipment used in both fixed wing and rotary winged aircraft, and covers a range of equipment such as intercom (clear), intercom (secure), high frequency (HF) radio, very high frequency (VHF) radio, ultra high frequency (UHF) radio, cockpit voice recorder, aircraft communication address reporting system (ACARS), crash position indicators, digital data links, secure radio links, flight entertainment systems, satellite communications (SATCOM), and selective calling (SELCAL), as applicable to the aircraft type. The overhauling activities will include carrying out all necessary safety checks, dismantling the equipment to unit or component level, inspecting and checking all components for damage and wear, replacing all `lifed' items and worn/faulty components or units, reassembling the equipment and carrying out all necessary tests/checks.

Your responsibilities will require you to comply with organisational policy and procedures for the overhauling activities undertaken, and to report any problems with the overhauling activities, or with the tools and equipment used that you cannot personally resolve or that is outside your permitted authority, to the relevant people. You must ensure that all tools, equipment and materials used in the overhauling activities are removed from the work area, and that all necessary job/task documentation is completed accurately and legibly. You will be expected to work with a minimum of supervision, taking personal responsibility for your own actions and for the quality and accuracy of the work that you carry out.

Your underpinning knowledge will provide a good understanding of your work and will provide an informed approach to applying appropriate overhauling procedures to aircraft communication equipment. You will understand the dismantling and reassembly methods and procedures used, and their application. You will know how the equipment functions, the common faults encountered, the purpose of the individual components and associated defects, in adequate depth to provide a sound basis for carrying out the overhauling activities and ensuring that the overhauled equipment meets the required specification.

You will understand the safety precautions required when carrying out the overhaul activities. You will be required to demonstrate safe working practices throughout and will understand your responsibility for taking the necessary safeguards to protect yourself and others in the workplace.


Performance criteria

You must be able to:

  1. work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines
  2. follow the relevant overhauling schedules to carry out the required work
  3. establish the components to be removed and where appropriate, mark/label components to aid re-assembly
  4. carry out the overhaul to the agreed level, using the correct tools and techniques
  5. ensure that all removed components are correctly identified and stored in the correct location
  6. replace/refit components using appropriate methods and techniques
  7. carry out checks on the overhauled equipment using correct procedures
  8. report any instances where the overhauling activities cannot be fully met, or where there are identified defects outside the planned overhauling schedule

  9. complete the relevant documentation in accordance with organisational requirements

  10. dispose of unwanted components, waste materials and substances in accordance with safe working practices and approved procedures
  11. deal promptly and effectively with problems within your control and report those that cannot be solved
  12. leave the equipment in a safe and appropriate condition, free from foreign object debris

Knowledge and Understanding

You need to know and understand:

  1. the safe working practices and procedures and the specific safety precautions to be taken when overhauling aircraft communication equipment (to include wearing protective clothing and equipment; lifting and handling techniques; safe working practices and procedures with regard to working on aircraft communication equipment; procedures and guidelines which satisfy current regulations such as HASAWA, COSHH and other work related legislation and guidelines)
  2. the hazards associated with overhauling aircraft communication equipment, and with the tools and equipment used, and how to minimise them and reduce any risks
  3. the requirements and importance of understanding and applying human factors as defined by the regulatory requirements and the potential impact if these are not adhered to
  4. the protective equipment that you need to use for both personal protection (PPE) and protection of the communication equipment

  5. what constitutes a hazardous voltage and how to recognise victims of electric shock

  6. how to reduce the risks of a phase to earth shock (such as insulated tools, rubber matting and isolating transformers)

  7. how to extract and use information from equipment manuals, history/maintenance reports, charts, circuit and physical layouts, specifications, symbols used in aircraft communication systems and other documents needed in the overhauling process

  8. how to carry out currency/issue checks on the specifications you are working with
  9. terminology used in aircraft communication equipment and the use of system diagrams and associated symbols
  10. the principles of operation of the aircraft communication equipment being overhauled, and the performance characteristics and function of the components within the equipment
  11. the techniques used to remove components from aircraft communication equipment, without damage to the components or surrounding structure (such as de-soldering components, applying electrostatic discharge (ESD) protection procedures)
  12. the various types of electrical connector that are used, methods of unlocking, orientation indicators and locating and locking in of the connections
  13. the various mechanical fasteners that are used and their method of removal and replacement (such as threaded fasteners, special securing devices)
  14. the importance of using the specified fasteners for the particular installation and why you must not substitute others
  15. why securing devices need to be locked and labelled, and the different methods that are used to remove and install them

  16. the torque loading requirements of the fasteners and what to do if these loadings are exceeded or not achieved

  17. the need to label and store components correctly and to check that replaced components have the correct part/identification markings
  18. the procedure for obtaining replacement parts, materials and other consumables necessary for the overhaul
  19. the techniques used to position, align, adjust and secure the replaced components to the equipment without damage to the components or surrounding structure
  20. the quality control procedures to be followed during the overhauling operations
  21. procedures for ensuring that you have the correct tools, equipment, components and fasteners for the activities
  22. methods of lifting, handling and supporting the components/equipment during the removal and replacement activities
  23. the use of seals, sealant and adhesives and anti-electrolysis barriers, and the precautions to be taken
  24. why electrical bonding is critical and why it must be both mechanically and electrically secure
  25. how to conduct any necessary checks and adjustments to ensure the system integrity, accuracy and quality of the overhaul
  26. the tools and equipment used in the overhauling activities and their calibration/care and control procedures
  27. why tool/equipment control is critical and what to do if a tool or piece of equipment is unaccounted for on completion of the overhauling activities
  28. the problems that can occur with the overhauling operations and how these can be overcome
  29. how to recognise defects (such as poor seals, misalignment, incorrectly seated plugs and sockets, ineffective fasteners, foreign object damage or contamination)
  30. the recording documentation to be completed for the activities undertaken and where appropriate, the importance of marking and identifying specific pieces of work in relation to the documentation
  31. the procedure for the safe disposal of waste materials and scrap components
  32. the extent of your own responsibility and to whom you should report if you have problems that you cannot resolve

Scope/range


Scope Performance

  1. Carry out all of the following during the overhauling activities:

    1. obtain and use the appropriate documentation (such as job instructions, aircraft manuals and overhauling documentation, technical instructions and other relevant maintenance documentation)
    2. adhere to procedures or systems in place for risk assessment, COSHH, personal protective equipment and other relevant safety regulations and procedures to realise a safe system of work
    3. provide and maintain safe access and working arrangements for the overhauling area
    4. obtain the correct tools and equipment for the activity and check that they are in a safe, tested and usable condition and within current certification/calibration date
    5. where appropriate, apply electrostatic discharge (ESD) protection procedures
    6. carry out the overhauling activities, using approved techniques and procedures at all times
    7. ensure that the equipment is maintained free from damage and foreign objects
    8. return all tools and equipment to the correct location on completion of the activities
  2. Carry out the overhauling activities to unit level on three of the following types of aircraft communication equipment:

    1. VHF radio                                             
    2. cockpit voice recorder
    3. intercom (clear)                      
    4. SATCOM
    5. intercom (secure speech)            
    6. digital data links
    7. secure radio links                    
    8. flight entertainment systems
    9. HF radio                                       
    10. SELCAL
    11. UHF radio                             
    12. crash position indicators
    13. aircraft communication address reporting system (ACARS)  
    14. telecommunications
  3. Carry out all of the following activities, as applicable to the equipment being overhauled:

    1. cleaning parts prior to dismantling            
    2. checking components for serviceability
    3. pre-disassembly checks and tests     
    4. replacing all 'lifed' items (such as seals, dust caps)
    5. disconnecting and de-soldering electrical connections    
    6. replacing all damaged or defective components                                    
    7. reassembling equipment
    8. removal of earth bonding                    
    9. setting and adjusting/calibrating replaced components (such as power output, voltage)
    10. removal of conformal coating                                         
    11. removing cable securing devices                       
    12. making mechanical connections
    13. removing bolt securing devices and mechanical fasteners
    14. soldering electrical connections                                                                 
    15. carrying out earth bonding
    16. dismantling equipment to unit/sub-assembly level
    17. installing cable securing devices
    18. dismantling units to component level          
    19. tightening fastenings to the required torque
    20. marking/labelling of components to aid reassembly  
    21. re-instating conformal coating
    22. securing components using mechanical fasteners and threaded devices
    23. applying locking and retaining devices (such as circlips, pins, wire locking)
  4. Carry out overhauling activities to component level on three of the following communication equipment components:

    1. power supply units                   
    2. tuning units
    3. aerials                                
    4. transmitter units
    5. receiver units                     
    6. transformers
    7. satellite beacons                 
    8. control units
    9. transponders                       
    10. intercom station boxes
    11. antenna switching units
    12. other specific components
  5. Replace a range of communication equipment components, to include

eight of the following:

1.  batteries                              
2.  transformers         
3.  plugs/sockets/terminations
4.  switches                         
5.  unit trays      
6.  speakers
7.  fuses                                   
8.  headsets        
9.  microphone units
10.  relays                            
11.  instruments/gauges/ indicators   
12.  chassis components
13.  circuit breakers                                                                        
14.  gaskets/seals
15.  printed circuit boards            
16.  filament lamps/light emitting diodes  
17.  screws/bolts/washers
18.  electronic components (such as resistors, capacitors)                       
19.  wires/cables
20.  other specific components  
  1. Carry out checks and tests on the overhauled equipment, to include five of the following:

    1. visual inspection for completeness and freedom from damage or foreign objects                                
    2. signal injection tests
    3. power output
    4. soak test                               
    5. continuity checks
    6. bonding tests                       
    7. standard serviceability test
    8. voltage standing wave ratio (VSWR) checks 
    9. `special-to-type' tests
  2. Overhaul aircraft communication equipment in compliance with one of the following:

    1. Civil Aviation Authority (CAA)/European Aviation Safety Agency (EASA)
    2. Ministry of Defence (MoD)
    3. Military Aviation Authority (MAA)
    4. Aerospace Quality Management Standards (AS)
    5. Federal Aviation Authority (FAA)
    6. BS, ISO or BSEN standards and procedures
    7. customer standards and requirements
    8. company standards and procedures
    9. aircraft manufacturer's requirements
  3. Complete the relevant paperwork, to include one from the following and pass it to the appropriate people:

    1. job cards
    2. computer records
    3. aircraft service/flight log
    4. aircraft log book
    5. permit to work/formal risk assessment

Scope Knowledge


Values


Behaviours

You will be able to apply the appropriate behaviours required in the workplace to meet the job profile and overall company objectives, such as:

  • strong work ethic
  • positive attitude
  • team player
  • dependability
  • responsibility
  • honesty
  • integrity
  • motivation
  • commitment

Skills


Glossary


Links To Other NOS


External Links


Version Number

3

Indicative Review Date

2024

Validity

Current

Status

Original

Originating Organisation

Enginuity

Original URN

SEMAE3175

Relevant Occupations

Engineer, Engineering, Engineering and Manufacturing Technologies, Engineering Technicians

SOC Code

5234

Keywords

aircraft communication equipment; intercom (clear); intercom (secure); high frequency (HF) radio; very high frequency (VHF) radio; ultra high frequency (UHF) radio; cockpit voice recorder; aircraft communication address reporting system; crash position