Overhauling aircraft gas turbine engine combustion assemblies
Overview
This standard identifies the competences you need to carry out a complete overhaul of aircraft gas turbine engine combustion assemblies, in accordance with approved procedures. It covers both fixed wing and rotary winged aircraft engines. The combustion assembly to be overhauled will have been removed from the engine and the overhauling activities may take place in a workshop or hangar.
In carrying out the overhauling operations, you will be required to follow laid-down procedures and use specific dismantling and rebuilding techniques. The overhauling activities will involve removing all ancillary components and sub-assemblies, removing the combustion cans/chambers, nozzle guide vanes, outer guide vanes, bearings and seals, and stripping the combustion housing of all its components. You will be required to inspect the components for damage and wear, and to make decisions on which components can be reused and which will need replacing. You will then rebuild the combustion assembly, which will involve fitting replacement or overhauled sub-assembly units (such as combustion housing, combustion cans/chambers, nozzle guide vanes) and the replacement of all damaged, worn and `lifed' components. The overhauling activities will include making all necessary checks and adjustments to ensure that components are correctly replaced, positioned, aligned, adjusted, torque loaded, locked and fastened, and that the correct sealants are used.
Your responsibilities will require you to comply with organisational policy and procedures for the overhaul of the aircraft gas turbine engine combustion assembly, and to report any problems with the overhauling activities, or with the tools and equipment used that you cannot personally resolve or that is outside your permitted authority, to the relevant people. You must ensure that all tools, equipment and materials used in the overhauling activities are removed from the work area on completion of the activities, and that all necessary job/task documentation is completed accurately and legibly. You will be expected to work with a minimum of supervision, taking personal responsibility for your own actions and for the quality and accuracy of the work that you carry out.
Your underpinning knowledge will provide a good understanding of your work and will provide an informed approach to applying appropriate overhauling techniques and procedures to aircraft gas turbine engine combustion assemblies. You will understand the dismantling and reassembly methods and procedures used, and their application. You will know how the combustion assembly functions, the purpose of the individual components and associated defects, in adequate depth to provide a sound basis for carrying out the overhauling activities to the required specification. In addition, you will have sufficient knowledge of these components to ensure that they are fit for purpose and meet the specifications, thus providing a sound basis for carrying out the reassembly.
You will understand the safety precautions required when carrying out the overhauling activities associated with aircraft gas turbine engine combustion assemblies, especially those for lifting, handling and supporting the equipment being removed and replaced. You will be required to demonstrate safe working practices throughout and will understand your responsibility for taking the necessary safeguards to protect yourself and others in the workplace.
Performance criteria
You must be able to:
- work safely at all times, complying with health and safety and other relevant regulations, directives and guidelines
- follow the relevant overhauling schedules to carry out the required work
- establish the components to be removed and where appropriate, mark components to aid re-assembly
- ensure that any stored energy or substances are released safely and correctly
carry out the overhaul to the agreed level, using the correct tools and techniques
ensure that all removed components are correctly identified and stored in the correct location
- replace/refit components using appropriate methods and techniques
- carry out checks on the overhauled engine using correct procedures
report any instances where the overhauling activities cannot be fully met or where there are identified defects outside the planned overhauling schedule
complete the relevant documentation, in accordance with organisational requirements
- dispose of unwanted components, waste materials and substances, in accordance with safe working practices and approved procedures
- deal promptly and effectively with problems within your control and report those that cannot be solved
- leave the engine in a safe and appropriate condition, free from foreign object debris
Knowledge and Understanding
You need to know and understand:
- the specific safety practices and procedures that you need to observe when overhauling aircraft gas turbine engine combustion assemblies (including any specific legislation, regulations/codes of practice for the activities, equipment or materials)
- the health and safety requirements of the area in which the overhauling activity is to take place, and the responsibility these requirements place on you
- the hazards associated with overhauling aircraft gas turbine engine combustion assemblies (such as handling oils, greases, stored pressure/force, use of power tools, misuse of tools, using damaged or badly maintained tools and equipment, not following laid-down overhauling procedures, lifting and moving large and heavy components), and how to minimise them and reduce any risks
- the requirements and importance of understanding and applying human factors as defined by the regulatory requirements and the potential impact if these are not adhered to
- the importance of wearing protective clothing and other appropriate safety equipment (PPE) during the overhaul
- how to obtain and interpret drawings, specifications, manufacturers' manuals, history/maintenance reports, and other documents needed in the overhauling process
- how to carry out currency/issue checks on the specifications you are working with
- the quality control procedures to be followed during the overhauling operations
- the procedure for obtaining replacement parts, materials and other consumables necessary for the overhaul
- company policy on the repair/replacement of components during the overhauling process
- terminology used in aircraft gas turbine engine combustion assemblies
- the principles of how the combustion assembly functions, its operating sequence, the working purpose of individual units/components and how they interact
- the extent to which the equipment is to be dismantled for overhaul
- the sequence to be adopted for the dismantling/reassembling of the combustion assembly
- the techniques used to dismantle the aircraft gas turbine engine combustion assembly, without damage to the components or surrounding structure (such as release of energy/pressures/force; making mechanical disconnections; proof marking components to aid reassembly; removing assemblies having interference fits (such as expansion, contraction, and the use of presses and extractors); removing mechanical locking and securing mechanisms/devices)
- the need to protect the system integrity by ensuring that exposed components are correctly covered/protected
- how to lift and move large components and assemblies; the methods and equipment used to transport, handle and lift the components during the overhauling activities
- the need to ensure that lifting and handling equipment is within its current certification dates
- methods of checking that components are fit for purpose, how to identify defects and wear characteristics, and the need to replace `lifed' items (such as seals and gaskets)
- the uses of measuring equipment (such as micrometers, Verniers, expansion indicators and other measuring devices)
- methods of reassembling the aircraft gas turbine engine combustion assembly, using new or previously overhauled components (such as replacing assemblies requiring pressure/force, ensuring correct orientation, bedding in bearings and components, replacing mechanical locking and securing mechanisms/devices, torque setting components)
- how to make adjustments to replaced components/assemblies to ensure that they function correctly (such as checking alignment, balancing of rotating components such as turbines, setting working clearance, setting travel, and pre-loading bearings)
- the various mechanical fasteners that are used and their method of removal and replacement (including rivets, threaded fasteners, special securing devices)
- the various types of electrical connectors that are used, methods of unlocking, orientation indicators, and locating and locking in of the connections
- why electrical bonding is critical and why it must be both mechanically and electrically secure
- the tools/equipment used in the overhauling activities and how to check that they are in a safe, tested and usable condition
- the importance of ensuring that all tools are used correctly and within their permitted operating range
- the importance of ensuring that all tools, equipment and components are accounted for and returned to their correct location on completion of the overhauling activities
- the procedure for the safe disposal of waste materials
- the generation of maintenance documentation and/or reports following the overhauling activity
- the problems that can occur during the overhauling activity and how they can be overcome
- the extent of your own authority and to whom you should report if you have a problem that you cannot resolve
Scope/range
Scope Performance
Carry out all of the following during the overhaul of the aircraft gas turbine engine combustion assembly:
- obtain and use the appropriate documentation (such as job instructions, engine overhaul manuals, engineering drawings, technical instructions and other relevant maintenance documentation)
- adhere to procedures or systems in place for risk assessment, COSHH, personal protective equipment and other relevant safety regulations and procedures to realise a safe system of work
- provide and maintain safe access and working arrangements for the overhaul area
- obtain the correct tools and equipment for the activity, and check that they are in a safe and usable condition and within current certification/calibration date
- ensure that all oils, fluids and fuel have been drained/removed before breaking into the system
- ensure that the combustion assembly is suitably supported and that appropriate lifting and handling equipment is available
- carry out the overhauling activities, using approved techniques and procedures at all times
- ensure that components and surrounding structures are maintained free from damage and foreign objects
- return all tools and equipment to the correct location on completion of the activities
Dismantle the aircraft gas turbine engine combustion assembly, to include removing all of the following:
- combustion case
- outer guide vanes
- locking devices
- combustion cans/chambers
- seals and gaskets
- wire thread inserts
- annular combustion chambers
- shims and packing
- pipes and unions
- nozzle guide vanes
Carry out all of the following activities on the equipment being overhauled:
- cleaning parts prior to dismantling
- replacing all damaged or defective sub-assemblies and components
- pre-disassembly checks and tests
- releasing stored energy (where applicable)
- replacing all 'lifed' items (such as seals, bearings, gaskets)
- draining/removing any remaining fluids
- dismantling equipment to unit/sub-assembly level
- reassembling the combustion unit
- dismantling units to component level
- `blue bedding' components
- removing and replacing components having
- making mechanical connections interference fits (such as by expansion, contraction, pressure)
- setting and adjusting replaced components
- tightening fastenings to the required torque
- proof-marking/labelling of components to aid reassembly
- electrical bonding of components
- applying gaskets and sealant/adhesives
- checking components for wear and serviceability (such as visual, measurement, NDT, use of probes/scopes)
- securing components using mechanical fasteners and threaded devices
- applying locking and retaining devices (such as circlips, pins, wire locking, lock nuts, stiff nuts, swage nuts)
- applying protection to openings to prevent entry of contaminating debris
Replace a range of combustion assembly components, to include ten of the following:
- combustion case
- locking devices
- combustion cans/chambers
- wire thread inserts
- annular combustion chambers
- pipes and unions
- nozzle guide vanes
- mechanical controls (such as plungers, springs, rollers)
- outer guide vanes
- locks and stops
- electrical controls (such as solenoids, motors, switches)
- static seals/gaskets
- dynamic seals
- shims and packing
- other specific components
Carry out checks and tests on the overhauled equipment, to include six of the following:
- positional accuracy
- operating/working clearance
- orientation
- visual inspection for completeness and freedom from damage or foreign objects
- alignment
- freedom of movement
- 'special-to-type' test rig checks
Overhaul aircraft gas turbine engine combustion assemblies in compliance with one of the following:
- Civil Aviation Authority (CAA)/European Aviation Safety Agency (EASA)
- Federal Aviation Authority (FAA)
- Military Aviation Authority (MAA)
- Aerospace Quality Management Standards (AS)
- BS, ISO or BSEN standards and procedures
- customer standards and requirements
- company standards and procedures
- engine manufacturer's requirements
Complete the relevant paperwork, to include one of the following and pass it to the appropriate people:
- job cards
- computer records
- aircraft log books
- engine overhaul logs or reports
- work authorisation documents
- permit to work/formal risk assessment
Scope Knowledge
Values
Behaviours
You will be able to apply the appropriate behaviours required in the workplace to meet the job profile and overall company objectives, such as:
- strong work ethic
- positive attitude
- team player
- dependability
- responsibility
- honesty
- integrity
- motivation
- commitment