Prepare specifications for furniture to be assembled
URN: PROFFI18
Business Sectors (Suites): Fitted Furniture Installation
Developed by: Proskills
Approved on:
2015
Overview
This standard covers the skills and knowledge required to prepare specifications for assembly of fitted furniture in its final location.
This involves:
- interpreting information
- evaluating what is involved
- preparing specifications
- specifying methods, techniques, tools, materials to be used
- working in ways that ensure your own and other's safety
Performance criteria
You must be able to:
- comply with health and safety requirements and procedures at all times
- obtain specifications and requirements of the work following standard operating procedures
- assess types, qualities and quantities of material resources needed to meet requirements
- assess skill and knowledge base needed to carry out assemblies
- identify tools and equipment needed to meet requirements
- estimate time needed to achieve requirements
- check required personnel, time, resources, tools and equipment are available to meet specifications
- identify suitable alternatives where requirements cannot be met in full
- identify any problems which arise from requirements and report to appropriate person
- agree options to be followed where choices are possible in meeting requirements
- specify outcome qualities which must be met following standard operating procedures
- specify measurements and tolerances following standard operating procedures
- use appropriate technical terms in the specification
- specify processes, methods and techniques to achieve required results
- specify appropriate tools and equipment for work following standard operating procedures
- detail type and quality of resources to be used
- calculate allowed time for each stage of process and overall deadlines within which it must be completed following standard operating procedures
- provide examples of accurate specification of finished requirements
- record specifications following standard operating procedures
Knowledge and Understanding
You need to know and understand:
- steps, techniques, timings, skills, materials, tools and equipment needed to conduct furniture assembly/placement
- different types of skills and knowledge needed to carry out different processes within furniture assembly/placement
- handling characteristics of different species of wood and of wood composites used how these affect their use for different types of assembly
- identification and growth characteristics of different species of timber and its importance to tensile and compression strength, seasoning, durability, degradation, infestation and density
- typical time requirements for furniture assembly in location
- why it is important to check availability of different sorts of resources before committing to a piece of work
- constraints that can arise and why these might interfere with meeting requirements
- who to report problems to if you cannot solve them
- personal responsibilities with regard to health and safety
- conventions used in preparing work specifications and specifying measurements and tolerances for furniture assembly
- terminology used within furniture assembly
- uses of different methods, techniques and processes involved
- different materials used within furniture assembly, what they are used for, and why
- uses and descriptions of fixings, fittings and other attachments used in furniture assembly and in placement of furniture in location
- why it is of value to include examples when describing finishes and outcomes to be achieved
- personal protective equipment worn when handling different sorts of materials and using different types of tools and equipment, and why
Scope/range
Scope Performance
Scope Knowledge
Values
Behaviours
Skills
Glossary
Links To Other NOS
External Links
Version Number
3
Indicative Review Date
2020
Validity
Current
Status
Original
Originating Organisation
Proskills
Original URN
PROFM22
Relevant Occupations
Carpenter and Joiner, Furniture Makers and Other Craft Woodworkers, Paper and Wood Machine Operatives
SOC Code
5315, 5442, 8121
Keywords
Specification; installation; plan; schedule;