Preparing for and starting up the remote control operation
P1 obtain relevant operational instruction and ensure that information received on current operational status is accurate, complete and legible in accordance with worksite operational requirements and procedures
P2 brief relevant personnel and organise work of self and others where appropriate in accordance with worksite operational requirements and procedures
P3 accurately identify real and potential hazards and protect against them in accordance with worksite operational requirements and procedures
P4 Correctly prepare plant and utilities in accordance with worksite operational requirements and procedures
P5 carry out pre-start up checks in accordance with worksite operational requirements and procedures
P6 start up the process in accordance with procedures in accordance with worksite operational requirements and procedures
P7 Integrate plant and utilities and facilitate optimum processing in accordance with worksite operational requirements and procedures
P8 identify and take relevant action to deal with faults and any operational issues in accordance with worksite operational requirements and procedures
Remotely Control integrated process system **
P9 effectively maintain the process system ensuring steady state conditions maintained throughout in accordance with worksite operational requirements and procedures
P10 achieve required process system specification through appropriate work methods/ techniques in accordance with worksite operational requirements and procedures
P11 ensure that all information supplied and recorded is accurate, complete and legible in accordance with worksite operational requirements and procedures
P12 accurately identify and rectify faults and problems in accordance with worksite operational requirements and procedures
P13 promptly report deviations out with your responsibility in accordance with worksite operational requirements and procedures
Prepare and Shut down remote integrated process system
P14 effectively obtain operational instructions in accordance with worksite operational requirements and procedures
P15 accurately determine shut down time and make appropriate preparations for shut down in accordance with worksite operational requirements and procedures
P16 effectively brief relevant personnel on shut down procedures in accordance with worksite operational requirements and procedures
P17 accurately identify real and potential hazards and protect against them in accordance with worksite operational requirements and procedures
P18 ensure all information supplied and recorded is accurate, complete and legible in accordance with worksite operational requirements and procedures
P19 safely shut down the process system in accordance with worksite operational requirements and procedures
P20 effectively monitor shut down and correct faults and problems as appropriate in accordance with worksite operational requirements and procedures
Facilitate the Maintenance of the Process Plant and Equipment
P21 effectively apply and record inhibits or suppressions in accordance with worksite operational requirements and procedures
P22 effectively monitor process parameters when isolation is being applied (monitoring de-pressurisation where applicable, monitoring flare and or drains and ensuring process parameters are depleting in a controlled and steady manner)in accordance with worksite operational requirements and procedures
P23 effectively monitor process parameters during maintenance work scope being undertaken in accordance with worksite operational requirements and procedures
P24 effectively monitor process parameters during leak testing/service testing ensuring coordination with outside operator where required in accordance with worksite operational requirements and procedures
P25 effectively monitor process parameters during de-isolation and re-pressurisation – ensuring system returns back to normal operating pressures and levels in accordance with worksite operational requirements and procedures
P26 effectively remove and record inhibits or suppressions in accordance with worksite operational requirements and procedures
Comply with HSE and safe systems of work
P27 carry out relevant risk assessments and ensure that controls are in place to ensure that risks are as low as reasonably practicable in accordance with worksite operational requirements and procedures
P28 ensure that relevant safety briefings are carried out in accordance with worksite operational requirements and procedures
P29 work in accordance with safe systems of work
P30 take relevant steps to protect the environment in accordance with worksite operational requirements and procedures
P31 identify issues which may impact on safe systems of work and take relevant action in accordance with worksite operational requirements and procedures
P32 maintain relevant safety records in accordance with worksite operational requirements and procedures