Overview

This standard covers the skills and knowledge needed to carry out cavity wall clearance operations to create clear cavities that can be reinsulated or insulated if the system has been used to remove debris only. You must also prove knowledge and competence to create a clear cavity to be able to facilitate external rendering and external wall insulation complying with current Building Regulations. All work must be completed following safe working practices, relevant legislation, and comply with contract information and the allocated timescales.


Performance criteria

You must be able to:

  1. confirm survey reports and location details following standard operating procedures
  2. select and transport equipment and materials to sites to meet specifications
  3. set up sites and equipment to meet survey reports
  4. temporarily seal any apertures to prevent dust entering properties
  5. clear cavity walls following safe methods of work and standard operating procedures
  6. check cavity walls are clear of all materials and rubble following standard operating procedures
  7. confirm clearance meets requirements following standard operating procedures
  8. capture evidence required following standard operating procedures
  9. restore properties following standard operating procedures
  10. conduct post-extraction checks following standard operating procedures
  11. remove waste from site following current legislation
  12. remove tools and equipment from sites following standard operating procedures

Knowledge and Understanding

You need to know and understand:

  1. organisational security procedures for tools, equipment and personal belongings
  2. equipment and materials used
  3. information required before starting work
  4. relevant health and safety control equipment used
  5. resources used and how problems associated with resources are reported
  6. potential hazards associated with resources and methods of work
  7. how to calculate quantity and area for cavity wall clearance
  8. how to clear different materials and rubble from cavity walls
  9. how to check cavity walls are clear of materials and rubble and why this is important
  10. evidence you are required to capture
  11. how to restore properties
  12. how to protect work areas from damage and the purpose of protection
  13. post extraction checks
  14. how to maintain tools and equipment used
  15. how to remove waste

Scope/range


Scope Performance


Scope Knowledge


Values


Behaviours


Skills


Glossary


Links To Other NOS


External Links


Version Number

1

Indicative Review Date

31 Mar 2025

Validity

Current

Status

Original

Originating Organisation

GQA Qualifications

Original URN

GQACWE1

Relevant Occupations

Construction and Building Trades nec, Construction and Building Trades Supervisors, Construction Operatives

SOC Code

8159

Keywords

Cavity, extract, insulation