Clear cavity walls
URN: GQACWE1
Business Sectors (Suites): Glass Manufacturing
Developed by: GQA
Approved on:
28 Feb 2020
Overview
This standard covers the skills and knowledge needed to carry out cavity wall clearance operations to create clear cavities that can be reinsulated or insulated if the system has been used to remove debris only. You must also prove knowledge and competence to create a clear cavity to be able to facilitate external rendering and external wall insulation complying with current Building Regulations. All work must be completed following safe working practices, relevant legislation, and comply with contract information and the allocated timescales.
Performance criteria
You must be able to:
- confirm survey reports and location details following standard operating procedures
- select and transport equipment and materials to sites to meet specifications
- set up sites and equipment to meet survey reports
- temporarily seal any apertures to prevent dust entering properties
- clear cavity walls following safe methods of work and standard operating procedures
- check cavity walls are clear of all materials and rubble following standard operating procedures
- confirm clearance meets requirements following standard operating procedures
- capture evidence required following standard operating procedures
- restore properties following standard operating procedures
- conduct post-extraction checks following standard operating procedures
- remove waste from site following current legislation
- remove tools and equipment from sites following standard operating procedures
Knowledge and Understanding
You need to know and understand:
- organisational security procedures for tools, equipment and personal belongings
- equipment and materials used
- information required before starting work
- relevant health and safety control equipment used
- resources used and how problems associated with resources are reported
- potential hazards associated with resources and methods of work
- how to calculate quantity and area for cavity wall clearance
- how to clear different materials and rubble from cavity walls
- how to check cavity walls are clear of materials and rubble and why this is important
- evidence you are required to capture
- how to restore properties
- how to protect work areas from damage and the purpose of protection
- post extraction checks
- how to maintain tools and equipment used
- how to remove waste
Scope/range
Scope Performance
Scope Knowledge
Values
Behaviours
Skills
Glossary
Links To Other NOS
External Links
Version Number
1
Indicative Review Date
31 Mar 2025
Validity
Current
Status
Original
Originating Organisation
GQA Qualifications
Original URN
GQACWE1
Relevant Occupations
Construction and Building Trades nec, Construction and Building Trades Supervisors, Construction Operatives
SOC Code
8159
Keywords
Cavity, extract, insulation