Purge and commission gas storage vessels and supply systems
URN: EUSLPG8
Business Sectors (Suites): LPG Installation and Maintenance
Developed by: Energy & Utility Skills
Approved on:
30 Mar 2020
Overview
This standards is about the purging and commissioning of gas storage vessels and supply systems. This could also apply to bulk supply vessels for single or multiple dwellings or for cylinders. Gas storage vessels and supply systems can be for any type of fuel gas.
This standard includes checking storage and supply systems are correctly installed, checking incoming and outgoing service connections are operable, carrying out pre-commissioning checks, purging storage vessel, communicating commissioning requirements, checking the operation of service connections safety devices and controls and complying with legislative requirements.
This standard is for anyone who purges and commissions gas storage vessels and supply systems.
Performance criteria
You must be able to:
1. confirm that storage vessel installation complies with industry codes of practice and manufacturers' instructions
2. check that storage vessel type is suited to the intended purpose
3. check that the storage vessels have sufficient capacity to support the installation activities
4. ensure the storage vessels are free of damage and defects before work commences
5. check storage vessels for tightness using procedures that comply with industry codes of practice
6. carry out industry recognized visual checks for system leaks and wear and tear
7. carry out pre-commissioning tests and checks in accordance with industry codes of practice and regulations
8. calculate storage vessel siting, ventilation and dispersion requirements
9. check that the storage vessel cleanliness, and integrity complies with industry codes of practice
10. purge pipework to storage vessel s to ensure system cleanliness in compliance with industry requirements
11. check storage vessels are leak free and safe to accept gas
12. refer to manufacturers’ instructions on performance of storage vessel, regulators and components at appropriate times
13. inform people who are affected by your work about the effect on supply and likely timescales at appropriate points
14. monitor own performance against specified work schedules
15. communicate possible delays to customers, contractors and other people affected without delay
16. check operating pressure, operation of gas safety controls and safety shut off valves against performance requirements
17. complete commissioning documentation confirming safe commissioning of storage vessels
18. provide customers with information necessary for safe ongoing operation of storage vessels
Knowledge and Understanding
You need to know and understand:
1. industry codes of practice, regulatory and statutory requirements, procedures and safe working practices
2. hazards and risks and how to address them
3. sequences to follow in the commissioning process
4. procedures, equipment and legislative requirements for the correct siting and installation of gas storage vessels
5. methods of establishing the tightness of storage vessels, including regulations and HSE approved codes of practice
6. how to carry out tests and checks including tightness tests, pre commissioning checks, commissioning checks
7. methods of establishing that service connections are adequate from the storage vessels
8. actions to take where pre-commissioning checks or tests reveal defects
9. sources of information on the performance of storage vessels
10. routines and sequences for commissioning storage vessels
11. the effects of your work on others work routines and how to communicate with them
12. points in the commissioning process where co-operation and liaison with other trades and customers may be required
13. how to access user information appropriate to the storage vessels including supplier and emergency service number
14. how to complete commissioning documentation confirming the safe commissioning of storage vessels
15. the actions to take when storage vessels being commissioned do not meet design requirements
16. why it is important to reissue manufacturers' instructions to users
17. delays connected with work performance, material, tools and equipment availability, defects and damage
Scope/range
Scope Performance
Scope Knowledge
Values
Behaviours
Skills
Glossary
Links To Other NOS
External Links
Version Number
2
Indicative Review Date
30 Mar 2025
Validity
Current
Status
Original
Originating Organisation
Energy & Utility Skills
Original URN
EUSLGP20
Relevant Occupations
Engineering, Engineering and Manufacturing Technologies, Engineering Professionals, Professional Occupations
SOC Code
5315
Keywords
Commissioning, codes of practice, gas safety, statutory regulations; gas storage vessel; gas supply system; purge; commission; bulk supply vessel; multiple dwellings; cylinder;