Conduct Specified Testing of Gas Network Engineering Components and Assets in Gas Network Construction

URN: EUS GNC013
Business Sectors (Suites): Gas Network Construction
Developed by: Energy & Utility Skills
Approved on: 01 Dec 2017

Overview

​This national occupational standard defines the competences required to test gas network components and assets in accordance with industry standards and expectations. It includes making sure the manner in which tests are conducted and recorded meets the standards of quality assurance set by the organisation. It requires an understanding of safety requirements that need to be followed and adopted when carrying out test activities and procedures.

This standard is for those responsible for operations during gas network construction activities. These activities will usually include the leadership and direction of the members of a team and decision making regarding the approach to take when undertaking the work.


Performance criteria

You must be able to:

*Perform test activities *

1.          work safely in accordance with health and safety and environment regulations and legislation

2.          carry out a site specific risk assessment

3.          apply control measures identified in the risk assessments

4.          select, check condition, use and store the appropriate PPE

5.          secure the test site from possible third party interference and trespass

6.          use testing tools and equipment  in accordance with work instructions and manufacturers specifications

7.          make sure that equipment is functioning in  accordance with system operating requirements and parameters

8.          follow drawings, plans and specifications for the specified testing of gas network components and assets

9.          calculate specified test timings and levels

10.       anchor components and assets to withstand test pressures

11.       set up and carry out the tests following work instructions and within agreed timescales

12.       carry out all testing in compliance with approved industry and company procedures

13.       follow approved procedures to identify and solve problems that arise during testing

14.       review test results to establish that the performance of the system in accordance to specifications and performance parameters

15.       record the results of test activity and complete test record documents following reporting systems and using documentation in accordance with company procedures and requirements


Knowledge and Understanding

You need to know and understand:

General

1.          the main responsibilities of the employer and employee under the Health and Safety at Work Act and how to comply with them

2.          the main responsibilities of the employer and employee under environmental legislation

3.          how to carry out and review risk assessments

4.          the company reporting lines, roles, responsibilities and levels of authority

5.          the identification and application of safe procedures for handling hazardous and non-hazardous materials

6.          organisational accident recording and reporting procedures

7.          the range and use of personal protective equipment for the work activity and procedures for checking PPE is fit for purpose

8.          statutory, organisational and emergency reporting procedures

9.          the potential dangers and hazards from medium or intermediate or high pressure systems

Specified testing of gas network mains and services

10.       the health, safety and environmental requirements relevant to the testing activity

11.       different pressure regimes and associated methods for testing and recording

12.       how to calculate  specified test timings and levels

13.       the importance of adequate anchorage during the testing procedure

14.       the purging and commissioning specifications for components and assets

15.       how to use the types of test, purging and commissioning equipment, including those used in hydraulic testing, correctly

16.       how to calibrate the relevant pressure gauges, and why they need calibrating

17.       how to interpret test results against specifications and codes of practice

18.       the effect of atmospheric pressure and temperature on test results on components and assets

19.       the potential consequences of test failure including to the environment


Scope/range


Scope Performance


Scope Knowledge


Values


Behaviours


Skills


Glossary


Links To Other NOS


External Links


Version Number

2

Indicative Review Date

01 Dec 2021

Validity

Current

Status

Original

Originating Organisation

Energy & Utility Skills

Original URN

EUS GNC013

Relevant Occupations

Gas Team Leaders, Craftspersons and Technicians

SOC Code

5315

Keywords

gas, network, gas network, testing, assets, pressure, pressures