Contribute in the identification and promotion of cost or time savings through Project Control, Estimating, Planning & Cost Engineering activities during the concept and definition phases
Overview
Performance criteria
You must be able to:
You must be able to:
P1 Allocate target costs and investigate the anticipated quantities required for a range of business deliverables
P2 Understand and interpret the design requirements or design intent of the business / project deliverables
P3 Identify the key functional elements of the design requirements
P4 Support the identification of the key cost drivers associated with achieving the functional parameters
P5 Maintain cost models and/or Cost Response Curves
P6 Review concept and definition options, cost-performance trade-offs, and identify cost avoidance or cost reduction objectives
Knowledge and Understanding
You need to know and understand:
You must be able to:
K1 Principles of Target Costing or Scheduling
K2 Principles of Value Analysis and Value Engineering
K3 Principles of Process Improvement (e.g. Lean Manufacture)
K4 Engineering Design Principles and Practice
K5 Appreciation of associated Technologies, Processes and Facilities (e.g. Manufacturing, Construction or Information Technologies)
K6 Brainstorming techniques
K7 Cost Modelling techniques