Produce complex internal plaster finishes and surfaces
Overview
Performance criteria
You must be able to:
Knowledge and Understanding
You need to know and understand:
Scope/range
Scope Performance
Performance Criteria 1
1 interpretation of drawings, specifications, schedules and manufacturers' information related to the work to be carried out
Performance Criteria 2
2 avoidance of risk by following the given information relating to at least one of the following
2.1 methods of work
2.2 safe use of personal protective equipment (PPE)
2.3 safe use of access equipment
2.4 safe use and storage of products, tools and equipment
Performance Criteria 3
3 selection of resources associated with own work
3.1 materials, components and fixings 3.2 tools and equipment
Performance Criteria 4
4 protection of the work and its surrounding area from damage
5 minimise damage and maintain a clean work space
6 disposal of waste in accordance with legislation
Performance Criteria 5
7 demonstration of work skills to measure, mark out, mix, apply, fit, finish, position and secure
8 use and maintain hand tools, portable power tools and ancillary equipment
9 prepare materials and apply internal plasterwork to given working instructions
9.1 ellipses
9.2 domes
9.3 niches and/or apses
Performance Criteria 6
10 completion of own work within the estimated, allocated time to meet the needs of other occupations and/or clien
Scope Knowledge
Disposal of waste
1 environmental responsibilities, organisational procedures, manufacturers’ information, statutory regulations and official guidance
Emergencies
2 operative's response to situations in accordance with organisational authorisation and personal skills when involved with
2.1 fires, spillages, injuries
2.2 emergencies relating to occupational activities
Hazards
3 those identified by risk assessment, method of work, manufacturers’ technical information, statutory regulations and official guidance
Information
4 drawings, specifications, schedules, manufacturers' information and regulations governing buildings
Legislation and official guidance
5 this relates to the operative's responsibilities regarding potential accidents and health hazards whilst working in the workplace, below ground level, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting Maintenance 6 operative care of hand tools and/or portable power tools and ancillary equipment
Methods of work
7 application of knowledge for safe work practices, procedures and skills, relating to the method/area of work and materials used, to
7.1 prepare modern and traditional internal backgrounds
7.2 apply and finish plasterwork to complex walls and ceilings using modern and traditional methods
7.3 prepare and produce scagliola and polished and plasterers finishes
7.4 position and secure modern and traditional laths
7.5 mix modern and traditional plaster
7.6 apply additives and colourings
7.7 use hand tools, power tools and equipment
7.8 work at height
7.9 use access equipment
8 team work and communication
9 needs of other occupations associated with producing complex internal plaster finishes and surfaces
Personal protective equipment (PPE)
10 occupational use, types, purpose of each type and work situations
Problems
11 those arising from information, resources and methods of work
11.1 own authority to rectify
11.2 organisational reporting procedures
Programme
12 types of progress charts, timetables and estimated times
13 organisational procedures for reporting circumstances which will affect the work programme
Protect work
14 protect work against damage from general workplace activities, other occupations and adverse weather conditions
Resources
15 materials, components and equipment relating to types, quantity, quality, sizes and sustainability of standard and/or specialist
15.1 plasters, undercoats, limes, fixings, bonding agents, pre-cast components, pigments and additives
15.2 beads, trims, scrim and tapes
15.3 modern and traditional laths
15.4 hand and/or powered tools and equipment 1
6 methods of calculating quantity, length, area and wastage associated with the method/procedure to produce complex internal plaster finishes and surfaces
Security procedures
17 site, workplace, company and operative