Install plasterboard linings

URN: COSVR130
Business Sectors (Suites): Interior Systems (Construction)
Developed by: CITB
Approved on: 2021

Overview

​This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment, preparing, installing and repairing plasterboard linings This standard is for people working in the occupational area of interior systems and can be used by operatives, supervisors and managers


Performance criteria

You must be able to:

P1: Interpret the given information relating to the work and resources to confirm its relevance.

P2: Comply with the given, relevant legislation and official guidance to carry out your work and maintain safe and healthy work practices.

P3: Select the required quantity and quality of resources for the methods of work.
P4: Comply with organisational procedures to minimise the risk of damage to the work and surrounding area.
P5: Comply with the given contract information to carry out the work efficiently to the required specification.

P6: Complete the work within the allocated time, in accordance with the programme of work.


Knowledge and Understanding

You need to know and understand:

P1: Interpretation of information
K1: The organisational procedures developed to report and rectify inappropriate information and unsuitable resources, and how they are implemented.
K2: The types of information, their source and how they are interpreted.
K3: The organisational procedures to solve problems with the information and why it is important they are followed.  
P2: Safe work practices
K4: The level of understanding operatives must have of information for relevant, current legislation and official guidance and how it is applied.
K5: How emergencies should be responded to and who should respond.
K6: The organisational security procedures for tools, equipment and personal belongings.
K7: What the accident reporting procedures are and who is responsible for making the report.
K8: Why, when and how health and safety control equipment should be used.
K9: How to comply with environmentally responsible working practices to meet current legislation and official guidance.  
P3: Selection of resources
K10: The characteristics, quality, uses, sustainability, limitations and defects associated with the resources and how defects should be rectified.
K11: How the resources should be used and how any problems associated with the resources are reported.
K12: The organisational procedures to select resources, why they have been developed and how they are used.
K13: The hazards associated with the resources and methods of work and how they are overcome.  
P4: Minimise the risk of damage
K14: How to protect work from damage and the purpose of protection.
K15: Why disposal of waste should be carried out safely and how it is achieved.  
P5: Meet the contract specification
K16: How methods of work, to meet the specification, are carried out and problems reported.
K17: How maintenance of tools and equipment is carried out.  
P6: Allocated time
K18: What the programme is for the work to be carried out in the estimated, allocated time and why deadlines should be kept.


Scope/range

Performance Criteria 1
1: Interpretation of drawings, specifications, schedules, method statements, risk assessments and manufacturers’ information related to the work to be carried out.
Performance Criteria 2  
2: Avoidance of risk by complying with the given information relating to the following: 2.1 Methods of work 2.2 Safe use of health and safety control equipment 2.3 Safe use of access equipment 2.4 Safe use, storage and handling of materials, tools and equipment 2.5 Specific risks to health
Performance Criteria 3
3: Selection of resources associated with own work: 3.1 Materials, components and fixings 3.2 Tools and equipment
Performance Criteria 4
4: Protection of the work and its surrounding area from damage
5: Maintenance of a clean work space
6: Disposal of waste in accordance with current legislation
Performance Criteria 5
7: Demonstration of work skills to measure, mark out, fit, finish, position and secure
8: Use and maintain hand tools, portable power tools and ancillary equipment
9: Install plasterboard linings to given working instructions, including forming openings and carrying out repairs: 9.1 To timber and/or metal (tacking) 9.2 To solid backgrounds by direct bonding (dot and dab)
Performance Criteria 6
10: Completion of own work within the estimated, allocated time to meet the needs of other occupations and/or client


Scope Performance


Scope Knowledge

Performance Criteria 1
K1: Environmental responsibilities, organisational procedures, manufacturers’ information, statutory regulations and official guidance  
Performance Criteria 2
K2: Operative’s response to situations in accordance with organisational authorisation and personal skills when involved with: K2.1 Fires, spillages, injuries K2.2 Emergencies relating to occupational activities  
Performance Criteria 3
K3: Those identified by risk assessment, methods of work, manufacturers’ technical information, statutory regulations and official guidance  
Performance Criteria 4
K4: Health and safety control equipment identified by the principles of prevention for occupational use, types and purpose of each type, work situations and general work environment: K4.1 Collective protective measures K4.2 Personal protective equipment (PPE) K4.3 Respiratory protective equipment (RPE) K4.4 Local exhaust ventilation (LEV)  
Performance Criteria 5
K5: Drawings, specifications, schedules, method statements, risk assessments, manufacturers’ information and current guidance/regulations associated with installing plasterboard linings  
Performance Criteria 6
K6: This relates to the operative’s responsibilities regarding potential accidents, health hazards and the environment whilst working in the workplace, in confined spaces, at height, with tools and equipment, with materials and substances, with movement/storage of materials and by manual handling and mechanical lifting  
Performance Criteria 7
K7: Operative care of hand tools, portable power tools and ancillary equipment
Performance Criteria 8
K8: Application of knowledge for safe and healthy work practices, procedures and skills relating to the method/area of work and materials used to: K8.1 Identify and follow the installation quality requirements K8.2 Check vertical and horizontal datum K8.3 Establish the suitability of the existing substrate K8.4 Ensure the use of an appropriate fixing regime K8.5 Identify the location of, and work around, mechanical and electrical services K8.6 Install and repair plasterboard linings to timber and metal (tacking), and by direct bonding to solid backgrounds (dot and dab) K8.7 Form openings K8.8 Recognise and determine when specialist skills and knowledge are required and report accordingly K8.9 Work with, around and in close proximity to plant and machinery K8.10 Use hand tools, portable power tools and equipment K8.11 Work at height K8.12 Use access equipment  
Performance Criteria 9
K9: How fire spreads through a building and how to impede it and protect the structure
Performance Criteria 10
K10: Teamwork and communication K11: Needs of other occupations associated with the installation of plasterboard linings
Performance Criteria 12
K12: Those arising from information, resources and methods of work: K12.1 Own authority to rectify K12.2 Organisational reporting procedures
Performance Criteria 13
K13: Types of progress charts, timetables and estimated times K14: Organisational procedures for reporting circumstances which will affect the work programme
Performance Criteria 15
K15: Protect work against damage from general workplace activities, other occupations and adverse weather conditions
Performance Criteria 16
K16: Materials, components and equipment relating to types, quantity, quality, sizes and the sustainability of standard and/or specialist: K16.1 Wallboards, thermal boards, glass reinforced gypsum board, bonding compounds, fixings, fittings K16.2 Hand tools, portable power tools and equipment  
Performance Criteria 17
K17: Select correct resources and materials to comply with the specification
Performance Criteria 18
K18: Methods of calculating quantity, length, area and wastage associated with the method/procedure to install plasterboard linings  
Performance Criteria 19
K19: Site, workplace, company and operative security procedures


Values


Behaviours


Skills


Glossary


Links To Other NOS


External Links


Version Number

4

Indicative Review Date

2026

Validity

Current

Status

Original

Originating Organisation

CITB

Original URN

COSVR130

Relevant Occupations

Construction Operatives

SOC Code

8159

Keywords

Direct-bonding; Wallboards; Thermal-boards; Dot and dab; Tacking; Glass reinforced gypsum board